General three-dimensional flexible welding flat plates (welding platforms) do not need to be connected and fixed with the ground. For example, T-shaped flat plates for welding and assembly only need to be placed on the ground with a few pads after arriving at the use site. Just raise the level, but some three-dimensional flexible welded flat plates need to be fixed to the foundation and the ground. For example, motor test platforms, floor-standing boring machine workbenches, etc. need to perform impact, vibration and heavy pressure operations on the three-dimensional flexible welding flat plate (welding platform). Many customers have questions because they are not installing. How can the three-dimensional flexible welding flat plate (welding workbench) be connected to the ground and fixed without a foundation? The following three-dimensional flexible welding flat plate manufacturer will explain to you.
1. When designing the three-dimensional flexible welding platform, the foot holes connected to the ground must be taken into consideration, that is, the foot holes must be reserved at the bottom of the three-dimensional flexible welding plate.
2. Secondly, if anchor bolts are not used for connection, the three-dimensional flexible welded flat plate is directly fixed on the foundation with cement mortar, which is used to install a lightweight and well-balanced three-dimensional flexible welded flat plate with less vibration.
3. The installation method of short and long anchor bolts is: the three-dimensional flexible cast iron welded flat plate one-time pouring method is to bury the anchor bolts in advance when pouring the foundation, and pour the water intermittently with the foundation. According to the different embedding of bolts, they can be divided into two forms: fully pre-embedded and partial pre-embedded. The advantage is that it reduces the formwork project and increases the stability, reliability and performance of the anchor bolts; the disadvantage is that it is inconvenient to adjust. The secondary pouring method of three-dimensional flexible cast iron welded flat plate is to leave reserved holes for anchor bolts on the foundation in advance when pouring the foundation. When installing the equipment, put the bolts on, and then pour and pound the reserved holes for the anchor bolts with concrete or cement mortar. Reality. This method is suitable for light equipment with light fixed dynamic loads and small impact and vibration. The lower end of the three-dimensional flexible cast iron welded flat plate is T-shaped. This method is suitable for heavy-duty three-dimensional flexible cast iron welded flat plates with strong vibration and impact loads.